Road Rehabilitation


Managed by Bangkok Metropolitan Authority
Rachadamnoenklang Road, Bangkok

Road Rehabilitation Project Detail
Project : Road Rehabilitation
Managed by Bangkok Metropolitan Authority
Location : Rachadamnoenklang Road, Bangkok
Project Description : Settlement Course Demolition and renovation by
Renolith Course with Overlaying Asphalt Concrete
Total Area : 8,000 m2
Type of Existing Soil : Very Soft Clay
Type of Soil to Fill : Recycling Asphalt Concrete from Demolition for
Sub-grade Course
Type of Soil for Renolith Course : Crushed Rock
Typical Section : Sub-grade Course Thickness 15 cm
: Renolith Course Thickness 30 cm
: Asphalt Concrete Thickness 5 cm
Mix Design of Renolith Course : - Cement 5 % by Weight of Crushed Rock
- Renolith 10 % by Weight of Cement
- Water 5 % by Weight of Crushed Rock
Equipment : Back-Hoe, Grader, Roller Compactor and
Ready-Mixed Concrete Truck
Construction Period : 30 Days, November 1999
Project Cost : 3,200,000 Baht
Process : - Demolishing settlement course and excavating the soft clay.
- Filling the Recycling asphalt concrete, and compacting
through the construction site.
- Mixing crushed rock, cement and water at the mixer
plant, and mixing Renolith at the site
- Back Filling with the materials
- compacting to the dry density not less than 95%
maximum dry density
- Paving the Renolith base with asphalt concrete




road1.jpg - 11908 Bytes road2.jpg - 13412 Bytes




Projects

Concrete admixture road base
by
Renolith


©Copyright 1999 International Renolith Corporation Limited
Designed and Developed by Internet Business Network Co.,Ltd.