| Project |
FARM
ENTRANE ROAD BY RENOLITH |
| Location |
- Koda state, MALAYSIA |
| Project Description |
- Farm entrance
road |
| Total Area |
- (W) 3,240 m.
x (L) 4.30 m. x D 150 m. |
| Type of Existing
Soil |
- Crushed Rock |
| Type of Soil
to Fill |
- |
| Type of Soil
for Renolith Course |
- |
| Mix Design of
Renolith Course |
- Cement 6.8
% by Weight of Dry Soil
- Renolith 5% by Weight of Cement
- Water 8% by Weight Crushed Rock |
| Equipment |
- Grader/Rotary/Water
truck /Labor |
| Construction
Period |
- 26 hour |