| Project |
Queen Sirikit Health Park
Managed by Mahsarakarm Municipal |
| Location |
- Mahasarakham
Province |
| Project Description |
- Pond Lining to
Protect Permeability of Water |
| Total Area |
- 625 m2 |
| Type of Existing
Soil |
- Sandy Silt |
| Type of Soil
to Fill |
- No Fill |
| Type of Soil
for Renolith Course |
- Existing Soil |
| Typical Section |
- Renolith Slab Thickness 20 cm
- Renolith Retaining Wall Thickness 15 cm |
| Mix Design of
Renolith Course |
- Cement 5
% by Weight of Dry Soil
- Renolith 5 % by Weight of Cement
- Water 10% by Weight of Dry Soil |
| Equipment |
- Tilting Concrete
Mixer |
| Construction
Period |
- 9 Days,
31 August - 8 September, 1999 |
| Project Cost |
82,000 Baht |