project.jpg - 17863 Bytes

Trial Project for Renolith Road Construction

ILOCOS NORTE PROVINCE,
PHILIPPINES

Road Construction Project Detail
Project : Farm to Market Road Construction
Location : ILOCOS NORTE PROVINCE, PHILIPPINES
Project Description : Trial Project for Renolith Road Construction
Total Area : 150 m length
Type of Existing Soil : Sandy Silt
Type of Soil to Fill : No Fill
Type of Soil for Renolith Course : Existing Soil
Section 1 Kiling Road : Length 50 m. x Width 4 m. x Depth 15 cm.
Mix Design of Renolith Course : - Portland Cement 5 % by Weight of Dry Soil
- Renolith 10 % by Weight of Portland Cement
- Water 8 % by Weight of Dry Soil
Section 2 San Augustine : Length 50 m. x Width 3 m. x Depth 15 cm.
Mix Design of Renolith Course : - Portland Cement 7 % by Weight of Dry Soil
  - Renolith 5 % by Weight of Portland Cement
  - Water 8 % by Weight of Dry Soil
Section 3 Sal Bang : Length 50 m. x Width 4 m. x Depth 15 cm.
Mix Design of Renolith Course : - Portland Cement 5 % by Weight of Dry Soil
  - Renolith 5 % by Weight of Portland Cement
  - Water 8 % by Weight of Dry Soil
Equipment : Grader
Rotary (fork) tiller
2 tons and12 tons vibratory roller
1 ton vibratory roller
Water truck
Construction Period : 3 1/2 hours per 1 section
Mainpower : 10 Males
Process : - Scarify and Grading insitu-soils, after that spreading out
Portland cement through the work area
- Homogeneously mixing Portland cement and insitu-soil
- Spraying a mixture of Renolith and water through the
- Homogeneously mixing Renolith and soil - cement,
work area, and then, Following up mixing.
- Compacting to the require density.

    

Projects

Concrete Admixture Road and Car Parking
With
Renolith


Copyright 1999 International Renolith Corporation Limited
Designed and Developed by Internet Business Network Co.,Ltd.