  Bicycle Track
Managed by Bangkok Metropolitan Authority

Project Bicycle Track
Managed by Bangkok Metropolitan Authority
Location - Ekamai - Ramintra Toll way Road
Project Description

- Bicycle Track along the footpath, 2.5 meter width and 24 kilometers length

Total Area - 60,000 m2
Type of Existing Soil - Sandy Silt
Type of Soil to Fill

- No Fill

Type of Soil for Renolith Course - Existing Soil
Typical Section

- Renolith Course Thickness 7 cm.
- Asphalt Concrete Thickness 3 cm.

Mix Design of Renolith Course

- Cement 5 % by Weight of Dry Soil
- Renolith 5 % by Weight of Cement
- Water 10 % by Weight of Dry Soil

Equipment - Grader / Roller Compactor
Construction Period - 1 Month, November 1997

 
 