| Project |
Bicycle
Track
Managed by Bangkok Metropolitan Authority |
| Location |
- Ekamai - Ramintra
Toll way Road |
| Project Description |
- Bicycle Track along the footpath,
2.5 meter width and 24 kilometers length
|
| Total Area |
- 60,000 m2 |
| Type of Existing
Soil |
- Sandy Silt |
| Type
of Soil to Fill |
- No Fill
|
| Type of Soil
for Renolith Course |
- Existing Soil |
| Typical
Section |
- Renolith Course Thickness
7 cm.
- Asphalt Concrete Thickness 3 cm.
|
| Mix Design of
Renolith Course |
- Cement 5 % by Weight of Dry
Soil
- Renolith 5 % by Weight of Cement
- Water 10 % by Weight of Dry Soil
|
| Equipment |
- Grader / Roller
Compactor |
| Construction
Period |
- 1 Month, November
1997 |