| Footpath and bicycle track |
| Project |
: Bicycle Track |
|
Managed by Bangkok Metropolitan Authority |
| Location |
: Along Ekamai - Ramintra Road |
| Project Description |
: Bicycle Track along the footpath, 2.5 meter width and |
|
24 kilometre length |
| Total Area |
: 60,000 m2 |
| Type of Existing Soil |
: Silty Sand |
| Type of Soil to Fill |
: No Fill |
| Type of Soil for Renolith Course |
: Existing Soil |
| Typical Section |
: Renolith Course Thickness 7 cm |
|
: Asphalt Concrete Thickness 3 cm |
| Mix Design of Renolith Course |
: - Cement 5 % by Weight of Dry Soil |
|
- Renolith 5 % by Weight of Cement |
|
- Water 10 % by Weight of Dry Soil |
| Equipment |
: Grader |
|
Roller Compactor |
| Construction Period |
: 20 Days, November 1997 |
| Project Cost |
: 10,000,000 Baht |
| Process |
: - Clearing the construction site, and taking out organic |
|
soil such as leaves, grass, root |
|
- Scarifying the existing soil, then mixed with cement, |
|
spraying Renolith and water, then thoroughly mixing again. |
|
the dry density not less than 95% maximum dry density |
|
- Compacting to the dry density not less than 95 % |
|
maximum dry density |
|
- Paving the Renolith base with asphalt concrete |