Footpath and bicycle track


Along Ekamai - Ramintra Road


Footpath and bicycle track
Project : Bicycle Track
Managed by Bangkok Metropolitan Authority
Location : Along Ekamai - Ramintra Road
Project Description : Bicycle Track along the footpath, 2.5 meter width and
24 kilometre length
Total Area : 60,000 m2
Type of Existing Soil : Silty Sand
Type of Soil to Fill : No Fill
Type of Soil for Renolith Course : Existing Soil
Typical Section : Renolith Course Thickness 7 cm
: Asphalt Concrete Thickness 3 cm
Mix Design of Renolith Course : - Cement 5 % by Weight of Dry Soil
- Renolith 5 % by Weight of Cement
- Water 10 % by Weight of Dry Soil
Equipment : Grader
Roller Compactor
Construction Period : 20 Days, November 1997
Project Cost : 10,000,000 Baht
Process : - Clearing the construction site, and taking out organic
soil such as leaves, grass, root
- Scarifying the existing soil, then mixed with cement,
spraying Renolith and water, then thoroughly mixing again.
the dry density not less than 95% maximum dry density
- Compacting to the dry density not less than 95 %
maximum dry density
- Paving the Renolith base with asphalt concrete
footpath1.jpg - 15329 Bytes footpath2.jpg - 15329 Bytes
footpath3.jpg - 15329 Bytes footpath4.jpg - 15329 Bytes


Projects

Bicycle Track
With
Renolith footpath and bicycle track Detail



Copyright 1999 International Renolith Corporation Limited
Designed and Developed by Internet Business Network Co.,Ltd.