| Project |
Road
Rachadamnoenklang
Managed by Bangkok Metropolitan Authority |
| Location |
- Rachadamnoenklang
Road, Bangkok |
| Project Description |
- Settlement Course
Demolition and renovation by Renolith Course with Overlaying
Asphalt Concrete |
| Total Area |
- 8,000 m2 |
| Type of Existing
Soil |
- Very Soft clay
|
| Type of Soil
to Fill |
- Recycling Asphalt
Concrete from Demolition for Sub-grade Course |
| Type of Soil
for Renolith Course |
- Crushed Rock |
| Typical Section |
- Sub-grade Thickness 15 cm
- Renolith Course Thickness 30 cm
- Asphalt Concrete Thickness 5 cm
|
| Mix Design of
Renolith Course |
- Cement 5 % by Weight of Crushed
Rock
- Renolith 10 % by Weight of Cement
- Water 5 % by Weight of Crushed Rock
|
| Equipment |
- Back-Hoe, Grader,
Roller Compactor and
Ready-Mixed Concrete Truck |
| Construction
Period |
- 30 Days, November
1999 |
| Project Cost |
- 3,200,000 Baht |